The new Gold Coast Airport International Terminal consists of 3 levels, featuring six gates, four glass aerobridges and over 30,000sqm of terminal and retail shopping.
We completed the installation throughout the entire new terminal and networked back to the existing domestic terminal through high level interface. We also completed fire engineered solutions of mechanical ventilation control and airport side door releasing, with full integration with BMS sprinkler and hydrant interfacing. In high-risk areas we also installed VESDA systems in services spaces and pre-action system interfacing.